浅析某水电站岩质边坡绿化技术OA

Brief analysis of the greening technology of the rock slope of a hydropower project

中文摘要英文摘要

杨房沟水电站根据工程建设需要,工程区开挖揭露出大量高陡岩质边坡,导致立地条件差,绿化实施难度大.现场通过 TBS厚层基材植被护坡、植被混凝土生态护坡、客土喷播植草护坡及CBS抗滑缓释营养棒四种绿化技术进行对比分析,选择合适的岩质边坡绿化技术.同时采用CBS抗滑缓释营养棒工艺技术,既节约了施工成本,又保证了绿化效果,为水电站岩质边坡的绿化施工提供了新的思路,可供类似工程边坡绿化施工参考.

A large number of high and steep rock slopes are exposed due to excavation of the Yangfanggou Hy-dropower Project area,resulting in poor site conditions and great difficulty in greening implementation.Thick-ened base-layer seeding(TBS),vegetation concrete ecological slope protection,soil spraying grass slope protec-tion and combined brake system(CBS)anti-slip slow release nutrient bar were used for comparative on site,and the suitable rock slope greening technology was selected.At the same time,the process technology of CBS an-ti-slip slow release nutrient bar was,which not only saved the construction cost,but also guaranteed the green-ing effect,and provided a new idea for the greening construction of the rock slope of the hydropower project,which can be referred to by the greening construction of the slope of similar projects.

王天星

中国水利水电第七工程局有限公司,四川 成都 610213

建筑与水利

杨房沟水电站岩质边坡绿化CBS抗滑缓释营养棒

Yangfanggou Hydropower Projectrock slopegreeningCBS anti-slip slow release nutrient bar

《四川水力发电》 2026 (2)

109-113,5

10.20196/j.cnki.scslfd.20260223