Design of dam demolition and reconstruction for Kada Reservoir
卡达水库大坝运行超40年,因当时建设局限及长期自然侵蚀,存在多处安全隐患,被鉴定为"三类坝",除险加固迫在眉睫,经比较,除险加固方案为拆除重建.新建埋石混凝土重力坝设计充分结合气象、水文、地质条件,对大坝枢纽进行科学布置.采用阶梯型逐层拆除法拆除旧坝,创新导流方式确保施工安全.此外,将旧坝固体废弃物加工成再生混凝土骨料用于新坝建设,实现资源的有效利用.
The dam of Kada Reservoir,after having operated for over 40 years,has multiple safety hazards due to the limitations of construction and long-term natural erosion,and is classified as a"Class III Dam".Urgent danger re-moval and reinforcement are required.After comparison,the adopted reinforcement plan is to carry out demolition and reconstruction.The new buried-rock concrete gravity dam is designed with scientific layout fully considering the meteorological,hydrological,and geological conditions.The old dam is designed to be removed by using the step-by-step demolition method.Innovative diversion is designed to ensure the construction safety.Furthermore,the solid waste from the demolition of old dam is to be processed into recycled concrete aggregates for the construc-tion of the new dam,thereby achieving the effective utilization of resources.
梁亮
广西水利电力勘测设计研究院有限责任公司,南宁 530023
建筑与水利
埋石混凝土重力坝固体废弃物再生混凝土卡达水库
buried-rock concrete gravity damsolid wasterecycled concreteKada Reservoir
《广西水利水电》 2026 (2)
71-75,5
评论