高水头土石围堰设计及施工关键技术研究OA
Research on key design and construction technologies of high-head earth-rock cofferdam
百色水库灌区银屯进水口围堰工程面临高水头(43.4 m)、全强风化砂泥岩地基及深水填筑(最大水下抛填深度20 m)等技术难题.本研究通过系统分析工程地质条件与水文特征,提出适应复杂地质的土石围堰分阶分区填筑技术,构建"深水抛填-水上压实-堰顶子堰"三阶七区的填筑体系,并创新采用全强风化料作为主体填筑材料.针对高水头防渗需求,研发"钢板桩-土工膜-混凝土锁口梁"三位一体刚柔复合防渗体系,结合深水区水下抛填与水上区高标准压实工艺,实现防渗与结构稳定协同控制.研究成果成功解决了复杂地质条件下高水头围堰施工难题,可为类似工程提供技术参考.
The cofferdam construction at the Yintun water intake of Baise Reservoir Irrigation Zone faces technical challenges such as high water head of 43.4m,completely intense weathered sandstone and mudstone foundation,and deep water filling with the maximum underwater dumping depth of 20m.A systematic analysis was made on the engineering geological conditions and hydrological characteristic,based on which a staged and zoned filling technol-ogy was proposed for earth-rock cofferdams that can adapt to complex geological conditions.A three-stage and sev-en-zone filling system is designed incorporating deep water dumping,waterborne compaction,and weir crest sub-weir,with completely intense weathered materials innovatively used as the primary filling materials.To address high-head seepage control requirements,a"steel sheet pile-geomembrane-concrete lock beam"tripartite rigid-flexible composite seepage control system is developed,which integrates deep-water underwater dumping with high-standard compaction in waterborne zones,achieving coordinated control of seepage resistance and structural stability.The research results successfully resolve the construction challenges for high-head cofferdams under com-plex geological conditions.
潘润峰;莫李生;陈荣华
广西水利电力勘测设计研究院有限责任公司,南宁 530023广西水利电力勘测设计研究院有限责任公司,南宁 530023广西水利电力勘测设计研究院有限责任公司,南宁 530023
建筑与水利
高水头土石围堰设计钢板桩防渗施工技术百色水库灌区
high-headdesign of earth-rock cofferdamseepage prevention with steel sheet pileconstruction tech-nologyBaise Reservoir Irrigation Zone
《广西水利水电》 2026 (2)