针对灯泡贯流式机组水电站厂房管型座结构形式和荷载条件错综复杂,且有限元软件缺乏相应配筋模块的问题,本文在ANSYS中分别采用shell63壳单元与solid45体单元对管型座结构进行模拟,通过MPC技术实现机组集中荷载的仿真,并二次开发了配筋命令流,有效解决了灯泡贯流式机组水电站厂房管型座混凝土有限元配筋的技术难题.该技术体系应用于马里共和国费鲁水电站厂房结构分析中,其模型构建、结构分析与配筋成果通过了加拿大AECOM咨询公司的审查,成果应用于工程实践,取得了显著的技术与经济效益.
In the powerhouse of a hydropower station equipped with bulb turbine units,the structure and load condi-tions of the concrete around stay cone are complicated.To address the issue of the finite element software lacking a corresponding reinforcement module,the shell63 shell element and the solid45 solid element of ANSYS were respectively used to simulate the stay cone structure;the concentrated load of the unit is simulated through MPC technology,and the secondary development of reinforcement command flow was conducted,which effectively solved the technical problem of finite element reinforcement for the concrete around stay cone of bulb turbine unit.This technical system had been applied in the powerhouse structural analysis of Félou Hydropower Station in the Republic of Mali.The model construction,structural analysis,and reinforcement results have passed the review of AECOM Consulting Company in Canada.The reinforcement results have been applied to engineering practice,achieving significant technical and economic benefits.
施先敏;李永新;黄小华;王富万
广西水利电力勘测设计研究院有限责任公司,南宁 530023广西水利电力勘测设计研究院有限责任公司,南宁 530023广西大学,南宁 530004广西水利电力勘测设计研究院有限责任公司,南宁 530023
建筑与水利
灯泡贯流式机组管型座三维模拟MPC有限元配筋马里费鲁水电站
bulb turbine unitstay conethree-dimensional(3D)simulationMPCfinite element reinforcementFélou Hydropower station in the Republic of Mali