龙云灌区水源工程布局研究OA
Study on layout of water source works in Longyun Irrigation Zone
新建大型灌区工程的水源方案比选和确定是工程规划设计的一项重要内容,关系到工程技术经济可行性,特别是在河流源头地区,如何布局调蓄性较强的水源工程,是项目成立与否的关键.本文以广西玉林市龙云灌区工程为例,研究提出新建大型灌区工程水源方案比选的思路和方法,并以该灌区有无中甘岭水库方案比较为例,详细说明方案比选的过程.
The comparison and selection of water source schemes is a crucial component in the planning and design of newly-built large-scale irrigation zone project,and it affects the technical and economic feasibility of the project.Especially in river source areas,the layout of water source works with strong regulation and storage capacity is cru-cial to the feasibility of the project.Taking the Longyun Irrigation Zone Project in Yulin City of Guangxi as an exam-ple,this article proposes the ideas and methods of comparing and selecting water source schemes for new large-scale irrigation zone projects.Taking the comparison between the schemes with and without the Zhongganling Reser-voir in this irrigation zone as an example,the process of scheme comparison and selection is elaborated in detail.
陈宗富
广西水利电力勘测设计研究院有限责任公司,南宁 530023
农业科技
龙云灌区水源工程布局蟠龙水库中甘岭水库云良水库玉林市
Longyun Irrigation Zonelayout of water source worksPanlong ReservoirZhongganling ReservoirYun-liang ReservoirYulin City
《广西水利水电》 2026 (2)
51-54,4
评论