基于全生命期成本分析的铁路桥梁设计方案比选OA
Comparative Selection of Railway Bridge Design Schemes Based on Life-Cycle Cost Analysis
铁路桥梁全生命期成本分析能够为桥梁设计方案的选择提供更为合理的数据支撑.以1座高速铁路桥梁为例,结合桥梁跨度需求,提出索加劲连续刚构桥和拱加劲连续刚构桥2种设计方案,基于概算分析,对2个设计方案的建设成本进行计算;考虑拉索性能时变规律的不确定性,建立计算桥梁运营中拉索、吊杆体系失效概率的时变模型,确定拉索、吊杆更换时间;针对拉索更换和拱肋涂装等维护行为,计算2种设计方案的运维成本,分析资本时间价值对运维成本的影响;考虑全生命期成本分析中数据和计算模型的不确定性,给出2种设计方案全生命期成本的分布区间.结果表明:桥梁运营期间检测、维修、加固成本对全生命期成本有较大影响,提出的全生命期成本分析方法能够有效预测运营期管养时间,为全生命期成本准确估计提供支撑;在全生命期成本分析过程中,需充分考虑建设及运营过程的不确定性及成本的时间价值;对于案例桥梁,从全生命期成本角度来看,索加劲连续刚构桥设计方案更具优势.
Life-cycle cost(LCC)analysis of railway bridges can provide more reasonable data support for the selection of bridge design schemes.Taking a high-speed railway bridge as an example and in combination with the bridge span requirements,two design schemes were proposed:cable-stiffened continuous rigid-frame superstructure and an arch-stiffened continuous rigid-frame superstructure.Based on the budgetary estimate,the construction costs for both design schemes were calculated.Accounting for the uncertainties inherent in the time-variant performance degradation of cables,a time-variant model for the calculation of the failure probability of the cable and hanger system during bridge operation was established to determine the optimal timing for cable and hanger replacement.For maintenance activities such as cable replacement and arch rib painting,the operation and maintenance costs of the two design schemes were calculated and the influence of the time value of capital on the operation and maintenance costs was analyzed.Addressing the uncertainties present in both the cost data and the calculation model,the distribution ranges of the LCCs for the two design schemes were presented.The results indicate that the costs of inspection,maintenance,and reinforcement during bridge operation significantly impact life-cycle costs.The life-cycle cost analysis method proposed in this study can effectively predict the maintenance timing during the operation period,providing support for accurate estimation of life-cycle costs.In the process of life-cycle cost analysis,it is necessary to fully consider the uncertainties during construction and operation,as well as the time value of costs.For the bridge in the case,from the perspective of life-cycle costs,the cable-stiffened continuous rigid-frame bridge design scheme has greater advantages,offering a reference for the selection of design schemes for similar long-span railway bridges.
解会兵;于佳平;韩冰;陈良江;周勇政;刘子钦
北京交通大学 土木建筑工程学院,北京 100044||城市轨道交通基础设施智能感知与韧性提升北京市重点实验室,北京 100044北京交通大学 土木建筑工程学院,北京 100044北京交通大学 土木建筑工程学院,北京 100044||城市轨道交通基础设施智能感知与韧性提升北京市重点实验室,北京 100044中国铁路经济规划研究院有限公司,北京 100038中国铁路经济规划研究院有限公司,北京 100038北京交通大学 土木建筑工程学院,北京 100044
交通工程
铁路桥梁设计方案比选全生命期成本资本时间价值不确定性
Railway bridgeDesignScheme comparisonLife-cycle costTime value of capitalUncertainty
《中国铁道科学》 2026 (2)
108-119,12
中国国家铁路集团有限公司科技研究开发计划课题(N2024G045)
评论