滇中引水隧洞线路长,穿越区域性断裂众多,严重威胁着隧洞工程的安全建设与运营.为研究隧洞穿越活动断裂遇高外水涌水问题,文章以香炉山隧洞穿越龙蟠—乔后活动断裂带为例,在分析断裂带特征的基础上,对香炉山隧洞 2 号支洞下游主洞过 F10-2 断裂带的开挖揭露情况、处置措施及加固效果进行评价分析,保障了隧洞施工安全.

The Yunnan Central Water Diversion Tunnel has a long route and crosses numerous regional faults,posing a serious threat to the safe construction and operation of the tunnel project.In order to study the problem of high external water inflow when crossing active faults in tunnels,this paper takes Xianglushan Tunnel crossing the Longpan-Qiaohou active fault zone as an example.Based on the analysis of the characteristics of the fault zone,the excavation exposure,disposal measures,and reinforcement effects of the downstream main tunnel passing through the F10-2 fault zone of Xianglushan Tunnel No.2 Branch were evaluated and analyzed to ensure the safety of tunnel construction.

杜彦彪

兰州交通大学工程检测有限公司,甘肃 兰州 730000

建筑与水利

滇中引水香炉山隧洞F10-2断裂带涌水突泥监测

Central Yunnan Water Diversion ProjectXianglushan TunnelF10-2 fault zonewater and mud inrushmonitor

《云南水力发电》 2026 (4)

46-49,4

云南省重大科技专项计划项目(202102AF080001)

10.3969/j.issn.1006-3951.2026.04.011