龙态河长山段治理工程设计洪水计算分析OA
Design Flood Calculation and Analysis of Longtai River Changshan Section Governance Project
龙态河流域局部河段河道的淤积严重,流域内工程经长期运行一些工程老化带来较多危险隐患,有必要对龙态河流域开展治理.治理工程运行的重点是设计洪水的复核,为明确工程设计标准,应进行设计洪水计算与分析,为治理工程建设提供设计依据.简述龙态河流域概况,对设计洪水计算中若干问题开展分析,旨在为治理工程建设提供详细数据.
The siltation of some sections of the Longtai River basin is severe,and the aging of some projects in the basin has brought many hidden dangers.It is necessary to carry out governance of the Longtai River basin.The key to the operation of governance projects is the review of design floods.In order to clarify the engineering design standards,design flood calculation and analysis should be carried out to provide design basis for the construction of governance projects.This paper briefly describes the overview of the Longtai River Basin and analyzes several issues in the calculation of design floods,aiming to provide detailed data for the construction of governance projects.
赵群
北票市农业农村局,辽宁 北票 122100
建筑与水利
治理暴雨洪水计算
governmentrainstormfloodcalculate
《云南水力发电》 2026 (4)
10-14,5
评论