首页|期刊导航|水利学报|高压隧洞钢筋混凝土衬砌裂缝开裂过程与影响因素研究

高压隧洞钢筋混凝土衬砌裂缝开裂过程与影响因素研究OA

Study on cracking process and influencing factors of reinforced concrete lining in high-pressure tunnels

中文摘要英文摘要

为有效防范钢筋混凝土衬砌在高水头作用下的严重开裂透水,在压力隧洞的设计中,需研究裂缝开裂过程及其影响因素,以指导限裂设计,控制裂缝宽度.本文基于孔隙和裂隙渗流-应力耦合理论,建立了压力隧洞双重介质渗流-应力-开裂耦合分析的块体离散元方法,并利用压力隧洞模型试验结果对该方法进行了验证.在此基础上,开展了大直径高压隧洞充排水过程数值模拟,分析了充排水过程中衬砌开裂演化特征,研究了围岩渗透系数、衬砌厚度、钢筋直径以及裂缝数量等因素对衬砌裂缝宽度的影响,探讨了现有裂缝控制标准的合理性.结果表明:所建方法可以较好反映压力隧洞模型试验结果及其运行工作性状;衬砌裂缝宽度与充水压力正相关;受开裂后衬砌外侧水压力的增加以及衬砌与围岩脱开的影响,裂缝开裂形态会经历一个复杂的转变过程;衬砌裂缝总宽度与围岩渗透系数、衬砌厚度、裂缝数量呈正比.研究成果可为高水头压力隧洞透水衬砌限裂设计提供技术支撑和理论参考.

To effectively prevent severe cracking and leakage in the reinforced concrete linings under high water pres-sure,it is essential to investigate the cracking process and its influencing factors for the purpose of guiding the crack-limiting design of pressure tunnels and controlling crack width.Based on the theory for coupling between stress and seepage flow in the the pores and fractures,a discrete element approach for seepage-stress-cracking coupling analy-sis of the dual medium of pressure tunnels was established.The approach was validated using the results from model tests of pressure tunnels.Subsequently,a numerical simulation of the filling and emptying process of large-diameter high-pressure tunnels was conducted.The characteristics of lining crack evolution during the process was analyzed,and the effects of factors such as the permeability coefficient of the surrounding rock,lining thickness,rebar diam-eter,and the number of cracks on the crack width in the lining was studied.The rationality of the existing crack con-trol criteria was discussed.The results indicate that the method established in this paper can effectively reflect the results of pressure tunnel model tests and the operational behaviors.The crack width in the lining is positively corre-lated with the filling water pressure.Due to the increased external water pressure on the lining after cracking and the separation between the lining and the surrounding rock,the crack propagation pattern undergoes a complex process.The total crack width in the lining is directly proportional to the permeability coefficient of the surrounding rock,lining thickness,and the number of cracks.The findings provide technical support and theoretical reference for the crack-limiting design of the permeable linings of high-head pressure tunnels.

刘学山;吴维江;张强;汪小刚;王明疆;郭凯

南方电网储能股份有限公司,广东 广州 510635||中国水利水电科学研究院流域水循环与水安全全国重点实验室,北京 100038中国水利水电科学研究院流域水循环与水安全全国重点实验室,北京 100038||南京工业大学交通运输工程学院,江苏南京 211816中国水利水电科学研究院流域水循环与水安全全国重点实验室,北京 100038中国水利水电科学研究院流域水循环与水安全全国重点实验室,北京 100038中国电建集团西北勘测设计研究院有限公司,陕西 西安 710065南方电网储能股份有限公司,广东 广州 510635

建筑与水利

高压隧洞钢筋混凝土衬砌渗流-应力-开裂耦合分析方法衬砌开裂特征裂缝控制标准

high-pressure tunnelreinforced concrete liningseepage-stress-cracking coupling analysis methodlining cracking characteristicscrack control criteria

《水利学报》 2026 (3)

444-457,470,15

国家电网公司总部科技项目(5200-202455105A-1-1-ZN)中国电建集团西北勘测设计研究院有限公司重点科技项目(XBY-KJ-2024-2)

10.3724/j.slxb.20250358

评论