双导洞三台阶法超大断面暗挖车站施工稳定性分析OA
Analysis on Stability of Extra-large Section Underground Station Construction Using Double-arch Three-step Method
为深入研究双导洞三台阶法在施工过程中的力学行为和工程特点,以某地铁的超大断面暗挖车站为分析对象,采用现场监测与数值模拟相结合的方法,在不同工况下对结构稳定性进行分析与计算,并对不同支护方案进行优劣比较,提出优化设计建议.通过分析双导洞三台阶法在超大断面暗挖车站中的应用,识别影响结构稳定性的关键因素,优化支护方案,提高施工安全性和效率.结果表明:在超大断面暗挖车站施工中,车站埋深、围岩预加固范围、台阶长度对拱顶沉降的影响最大,需特别关注车站拱顶围岩的变化;通过对比不同支护方案,可以显著提高施工的安全性和效率.
To thoroughly investigate the mechanical behavior and engineering characteristics of the double-arch three-step method during construction,this study took an extra-large section underground station from a certain subway as the analysis object.A combined approach of field monitoring and numerical simulation was employed to analyze and calculate structural stability under different working conditions,compare the advantages and disadvantages of various support schemes,and propose optimization design recommendations.By analyzing the application of the double-arch three-step method in extra-large section underground stations,the study identified key factors affecting structural stability,optimized support schemes,and enhanced construction safety and efficiency.The results show that,during the construction of extra-large section underground stations,station depth,pre-reinforcement range of surrounding rock,and step length have the most significant impact on arch settlement,requiring special attention to changes in surrounding rock at the station arch.By comparing different support schemes,construction safety and efficiency can be significantly improved.
杨彬;肖华;华宏燕;刘家顺;郑智勇;贾宝新
中铁建大桥工程局集团第三工程有限公司,沈阳 110043||辽宁工程技术大学土木工程学院,辽宁 阜新 123000中铁建大桥工程局集团第三工程有限公司,沈阳 110043辽宁工程技术大学土木工程学院,辽宁 阜新 123000辽宁工程技术大学土木工程学院,辽宁 阜新 123000辽宁工程技术大学土木工程学院,辽宁 阜新 123000辽宁工程技术大学土木工程学院,辽宁 阜新 123000
交通工程
砂岩超大断面暗挖车站临时支撑现场监测位移稳定性
sandstoneextra-large sectionunderground stationtemporary supporton-site monitoringdisplacementstability
《路基工程》 2026 (2)
156-162,7