该研究针对福州市长乐区克凤五门闸重建工程流塑淤泥层灌注桩施工难题,提出优化型泥浆护壁钻孔+气举反循环清孔+后注浆技术集成方案,采用钠基膨润土改性泥浆加固孔壁,结合气举反循环二次清孔与桩端注浆控制沉渣.工程应用表明,该技术使桩身质量检测合格率达100%,I类桩优良率超行业均值20%,突破流塑地层成桩瓶颈.相比传统工艺,单位工序成本降低30%、污染物治理成本降低40%,成为滨海流塑地层施工示范技术.

This study addresses the challenges in constructing cast-in-place piles in the fluid-plastic silt layer of the reconstruction project of Klt layer of the reconstruction project of Kefeng Wumen Sluice in Changle District,and proposes an integrated technical scheme consisting of optimized mud wall protection drilling,air-lift reverse circulation hole cleaning,and post-grouting.Sodium-based bentonite modified mud is used to reinforce the hole wall,combined with air-lift reverse circulation secondary hole cleaning and pile-end grouting to control sediment.Engineering applications show that this technology has achieved a 100%qualification rate in pile quality inspection,with the excellent rate of Class I piles exceeding the industry average by 20%,breaking through the bottleneck of pile formation in fluid-plastic strata.Compared with traditional techniques,the unit process cost is reduced by 30%and the pollutant treatment cost is reduced by 40%,making it a demonstration technology for construction in coastal fluid-plastic strata.

吴铭香

福建省水利水电建设有限公司,福州 350001

建筑与水利

流塑淤泥层灌注桩泥浆护壁后注浆技术滨海地质

flow-plastic silt layercast-in-place pilesmud wall protectionpost-grouting technologyshoreline geology

《广东水利水电》 2026 (4)

100-103,113,5