首页|期刊导航|云南水力发电|淮安二站枢纽导流墙对前池渗流特性影响研究

淮安二站枢纽导流墙对前池渗流特性影响研究OA

Study on the Influence of the Diversion Wall of Huai'an Second Station Hub on the Seepage Characteristics of the Forebay

中文摘要英文摘要

为研究淮安二站枢纽前池导流墙体型优化方案,根据工程设计开展了水工物理模型试验,对比了导流墙进水孔不同体型下,前池流态及水力监测参数变化.研究表明,进水孔边长不同,池内峰值水位所在断面具有滞后变化特征,孔边长愈大,则池水位愈高,但在孔边长 1.2 m 后水位整体变幅减小.低入池流量 25 m3/s与高流量 100 m3/s 工况中,池内流速分别呈"增长-下降-稳定"与"增长-下降"变化,同一流量工况中流速变化具有一致性.孔边长与流速呈负相关变化.孔边长对时均压强影响具有阶段区间性,在 0.3~0.9 m与1.2~1.8 m内变化差异各有不同,但时均压强值与孔边长呈正相关变化,且在孔边长1.2 m后增幅愈显著.

In order to study the optimization scheme of the shape of the diversion wall in the front pond of Huai'an Second Station Hub,hydraulic physical model tests were carried out based on the engineering design,and the changes in the flow state and hydraulic monitoring parameters of the front pond were compared under different shapes of the inlet holes of the diversion wall.Research has shown that the cross-section where the peak water level in the pool is located exhibits hysteresis variation characteristics depending on the length of the inlet hole.The larger the hole length,the higher the pool water level,but the overall amplitude of the water level decreases after the hole length is 1.2 m.In the operating conditions of low inlet flow rate of 25 m3/s and high flow rate of 100 m3/s,the flow velocity in the pool shows a"growth decrease stability"and"growth decrease"variation,respectively,and the flow velocity variation is consistent in the same flow condition.The length of the hole is negatively correlated with the flow velocity.The influence of hole edge length on time averaged pressure has stage interval characteristics,with differences in variation between 0.3-0.9m and 1.2-1.8m.However,the time averaged pressure value is positively correlated with the hole edge length,and the increase becomes more significant after the hole edge length is 1.2 m.

王飞;蒋纬宽;张奔;李蕴升

江苏省江都水利工程管理处,江苏 扬州 225200江苏省江都水利工程管理处,江苏 扬州 225200江苏省江都水利工程管理处,江苏 扬州 225200江苏省江都水利工程管理处,江苏 扬州 225200

建筑与水利

泵站前池渗流场模型试验

pump stationfront poolseepage fieldmodel testing

《云南水力发电》 2026 (3)

33-36,4

10.3969/j.issn.1006-3951.2026.03.008

评论