[目的]本文针对活性污泥2d号模型(ASM2d)参数众多、不确定性高的问题,开展参数敏感性分析,以识别关键参数、降低模型校准复杂度,为工艺模拟、校准与优化提供依据.[方法]本文以某污水厂厌氧-缺氧-好氧(AAO)工艺为对象,构建生物段处理工艺ASM2d模型,采用蒙特卡洛模拟结合拉丁超立方抽样,对筛选的39个模型参数进行全局敏感性分析,研究了不同模拟次数(78~210组)对分析结果的影响,并通过标准化回归系数量化参数对各出水指标的影响程度.[结果]当模拟次数达到156组以上时,敏感参数数量与排序趋于稳定,其中异养菌产率系数对化学需氧量(COD)的去除和污泥浓度模拟结果影响显著,自养菌最大生长速率和氨氮半饱和系数主导氨氮去除模拟,总磷去除的模拟结果则主要受厌氧条件下颗粒性有机物水解速率衰减系数、聚磷酸盐水解速率等参数影响.[结论]蒙特卡洛模拟可用于系统地识别ASM2d模型中的关键参数,建议在实际应用中采用不少于5倍参数数量的模拟次数以保证分析稳定性.研究结果可为模型参数校准与不确定性量化提供参考方法.
[Objective]To address the issues of numerous parameters and high uncertainty in the activated sludge model No.2d(ASM2d),this paper conducts a parameter sensitivity analysis to identify key parameters,reduce the complexity of model calibration,and provide a basis for process simulation,calibration,and optimization.[Methods]Based on an anaerobic-anoxic-oxic(AAO)process in a wastewater treatment plant(WWTP),an ASM2d model for the biological treatment section was constructed in this paper.Monte Carlo simulation combined with Latin Hypercube Sampling was employed to perform a global sensitivity analysis on 39 selected model parameters.The influence of different simulation run counts on the analysis result was investigated,and the impact degree of parameters on various effluent indices was quantified using standardized regression coefficients.[Results]When the number of simulation runs reached more than 156,the number and ranking of sensitive parameters tended to stabilize.Among them,the heterotrophic yield coefficient had a significant impact on the simulation result of chemical oxygen demand(COD)removal and sludge concentration.The autotrophic maximum growth rate and the ammonium half-saturation coefficient dominated the simulation of ammonia nitrogen removal.The simulation of total phosphorus removal was mainly influenced by parameters such as the reduction factor for hydrolysis of particulate organic matter under anaerobic conditions and the hydrolysis rate of polyphosphate.[Conclusion]Monte Carlo simulation can be used to systematically identify key parameters in the ASM2d model.It is recommended to use a simulation count no less than five times the number of parameters in practical applications to ensure the stability of the analysis.The result of this paper can provide a reference method for model parameter calibration and uncertainty quantification.
祝嘉禄;马艳
上海城市水资源开发利用国家工程中心有限公司,上海 200082上海城市水资源开发利用国家工程中心有限公司,上海 200082
建筑与水利
活性污泥模型蒙特卡洛模拟全局敏感性分析不确定性量化参数率定
activated sludge modelMonte Carlo simulationglobal sensitivity analysisuncertainty quantificationparameter calibration
《净水技术》 2026 (3)
114-122,9