为了明确伺服支撑系统在盖挖逆作基坑中的应用效果,满足软土地区超深盖挖逆作基坑精细化设计与施工需求,以天津地铁 8号线下瓦房站为依托,对伺服钢支撑作用下的软土超深盖挖逆作基坑变形特征展开研究.结果表明:地下连续墙(以下简称地连墙)深层水平位移随开挖深度呈阶段性增大,最大水平位移约为40 mm;伺服钢支撑安装后,伺服区地连墙深层水平位移平均增量接近0 mm,而标准段被动支护区最大增量约为15 mm,表明伺服钢支撑能够有效抑制地连墙变形,并减小了不同位置地连墙变形差异;地连墙竖向位移受施工顺序影响显著,先开挖区域上浮量较后开挖区域高约30%~40%;周边地表沉降最大值约为25 mm,约为地连墙最大水平位移的0.6倍,最大沉降位置距基坑边5~15 m.研究结果可为软土地区超深盖挖逆作基坑的伺服支撑设计与施工提供数据支撑.

To clarify the application effect of the servo support system in top-down excavationreverse foundation pit and meet the requirements for refined design and construction of ultra-deep top-down excavation reverse foundation pit in soft soil areas,this study took Xiawafang Station of Tianjin Metro Line 8 as a case study.The deformation characteristics of an ultra-deep top-down excavation in soft soil supported by servo steel supports were investigated based on field monitoring data.The results show that the deep horizontal displacement of the diaphragm wall increases in stages with excavation depth,with a maximum horizontal displacement of approximately 40 mm.After the installation of servo steel supports,the average increment of deep horizontal displacement in the servo-controlled area is close to 0 mm,while the maximum increment in the passive support area of the standard section reaches about 15 mm,indicating that servo steel supports can effectively restrain the deformation of the diaphragm wall and reduce the deformation differences along the excavation.The vertical displacement of the wall is significantly influenced by the construction sequence,and the uplift of the earlier excavated area is about 30%~40%larger than that of the later excavated area.The maximum ground surface settlement around the excavation is about 25 mm,which is approximately 0.6 times the maximum horizontal displacement of the diaphragm wall.The maximum settlement occurs at a distance of 5~15 m from the edge of the excavation.The results provide data support for the design and construction of servo support systems in ultra-deep top-down excavations in soft soil areas.

仲志武

中铁建交通运营集团有限公司,天津 300110

建筑与水利

地下工程伺服钢支撑逆作法基坑基坑变形案例分析

underground engineeringservo steel supportreverse construction foundation pitfoundation pit deformationcase analysis

《河北工业科技》 2026 (2)

126-137,12