基于线模相电流的串补线路故障选相方法OA
Installation locations of surge arresters on double-circuit transmission lines
串补电容的接入将改变线路的序网络阻抗及故障后的序电流分布,虽然对串补电容安装侧选相元件无不利影响,但可能会导致对侧选相元件误选相.为此,提出一种基于线模相电流的故障选相方法.首先,将线模相电流定义为各相故障分量电流与零序电流之差;然后,分析不同故障类型下线模相电流的特征,提取故障相与非故障相的特征差异,从而构造选相判据;最后,基于PSCAD平台进行仿真验证,结果表明,所提方法能够准确识别串补线路的故障相别,且其性能不受故障位置、线路长度、串补补偿度等因素的影响.
The connected series-compensated capacitors alter the sequence network impedance of transmission lines and the distribution of sequence currents during faults.While this does not adversely affect the phase-selection ele-ments on the capacitor installation side,it may lead to misidentification by those on the opposite side.To address this,a fault phase selection method based on line-mode phase current is proposed.First,the line-mode phase cur-rent is defined as the difference between the fault-component current of each phase and the zero-sequence current.Next,the characteristics of line-mode phase currents under different fault types are analyzed to extract distinctions between faulted and non-faulted phases,from which the phase-selection criterion is constructed.Finally,the method is validated through simulations on the PSCAD platform.The results show that the proposed method can ac-curately identify the faulted phase in series-compensated transmission lines,and its performance is robust with re-spect to fault location,line length,and the degree of series compensation.
杨黎明;谢诗敏;王仲;陈福锋;薛明军;陈中
国电南京自动化股份有限公司,南京 211100国电南京自动化股份有限公司,南京 211100国电南京自动化股份有限公司,南京 211100国电南京自动化股份有限公司,南京 211100国电南京自动化股份有限公司,南京 211100||东南大学 电气工程学院,南京 210096东南大学 电气工程学院,南京 210096
输电线路故障选相串补电容故障分量序分量
transmission linesfault phase selectionseries-compensated capacitorfault componentssequence components
《浙江电力》 2026 (3)
74-84,11
国家电网公司总部科技项目(5108-202218280A-2-276-XG)