首页|期刊导航|武汉工程职业技术学院学报|"双高计划"项目建设过程中存在的内部控制缺陷及优化对策

"双高计划"项目建设过程中存在的内部控制缺陷及优化对策OA

Deficiencies in Internal Control and Optimization Countermeasures During the Construction of the"Double High Plan"Project

中文摘要英文摘要

高职院校在"双高计划"建设过程中存在监管体系不健全、降低"双高计划"项目管控标准、绩效考核体系不完善等诸多问题,阻碍了"双高计划"的深入推进.针对上述问题,提出了加强内部控制文化建设、优化组织机构、加强项目库管理、建立全过程的监管体系、完善绩效目标体系、加强绩效评价结果的运用等优化措施.

Vocational colleges are confronted with a host of problems in the process of constructing the"Double High-Level Plan",such as an incomplete supervision system,lowered management and control standards for the"Double High-Level Plan"projects,and an imperfect performance appraisal system.These problems have hindered the in-depth advancement of the"Double High-Level Plan".In response to the above-mentioned problems,optimization measures are put forward,including strengthening the construction of internal control culture,optimizing the organizational structure,enhancing the manage-ment of the project database,establishing a full-process supervision system,improving the performance target system,and strengthening the application of performance evaluation results.

解冰雪

湖北开放大学/湖北科技职业学院 湖北 武汉:430074

社会科学

双高计划高职院校内部控制

double high-level planhigher vocational collegeinternal control

《武汉工程职业技术学院学报》 2026 (1)

51-55,5

评论