围绕丰宁抽水蓄能电站接入世界首个±500 kV 柔性直流电网及电力系统对电站多种运行方式的具体要求,针对其多台机组、变速机组的首次建设、定速机组和变速机组多种不同起动方式的特点,对电气主接线的安全性、可靠性、灵活性、经济性以及主要电气设备布置、建设工期等关键技术进行了全面深入的研究,并提出了一套满足多机组、多机型、多起动方式组合、多进出线回路的超大型抽水蓄能电站电气主接线设计方法.同时,还提出了"定/变速机组同跨度、同间距和主变洞多环行消防运维通道"的布置方法,有效解决了复杂地质条件下大型厂房受限空间布置的工程技术难题.此外,研发的交流励磁变速抽水蓄能机组的电气主回路设备双层布置结构和发电机电压回路、交流励磁回路、通风空调系统等设备协同设计方法,保障了变速机组交流励磁系统安全运行和便捷维护.上述成果成功支撑了国内首台套交流励磁变速机组的工程应用,并实现了多机型超大型抽水蓄能电站的全站商业运行.

Focusing on the connection of Fengning Pumped-storage Power Station to the world's first±500 kV flexible DC grid and the specific requirements of power system for various operation modes of the power station,considering the characteristics of its multiple units,the first construction of variable-speed units,as well as the various starting methods of fixed-speed units and variable-speed units,a comprehensive and in-depth study is conducted on key technologies such as the safety,reliability,flexibility and economy of the main electrical connection,the layout of main electrical equipments,and the construction period,and a set of design methods for the main electrical connection of an super-large pumped-storage power station that meets the combination of multiple units,multiple unit types,multiple starting methods,and multiple incoming and outgoing line circuits is proposed.At the same time,the layout method of"fixed/variable-speed units with the same span and same spacing,and multi-loop fire protection and maintenance channels for the main transformer tunnel"is proposed,effectively solving the technical problems of engineering layout in restricted spaces of large power plants under complex geological conditions.In addition,a double-layer layout structure of the main electrical circuit equipments for the AC-excited variable-speed pumped-storage units and a collaborative design method for the equipments such as generator voltage circuit,AC excitation circuit,and ventilation and air conditioning system are developed,ensuring the safe operation and convenient maintenance of the variable-speed unit AC excitation system.These achievements successfully support the engineering application of the first batch of AC excitation variable-speed units in China and realize the full commercial operation of large-scale pumped-storage power stations with multiple types of units.

倪晋兵;吴培枝;王志远;杨梅;王建明;王纯;王坤

国网新源河北丰宁抽水蓄能有限公司,河北 承德 068350国网新源河北丰宁抽水蓄能有限公司,河北 承德 068350国网新源河北丰宁抽水蓄能有限公司,河北 承德 068350中国电建集团北京勘测设计研究院有限公司,北京 100024中国电建集团北京勘测设计研究院有限公司,北京 100024中国电建集团北京勘测设计研究院有限公司,北京 100024中国电建集团北京勘测设计研究院有限公司,北京 100024

信息技术与安全科学

电气主接线交流励磁变速机组多起动方式组合受限空间双层母线洞

main electrical connectionAC-excited variable-speed unitscombinations of multiple starting methodsconstrained spacedouble-layer busbar tunnel

《水力发电》 2026 (4)

84-93,98,11

国网新源集团有限公司科技项目资助(SGXYKJ-2019-074)