丰宁抽水蓄能电站顺应我国能源结构发展要求,首次应用和建设了两台交流励磁变速机组,且首次全面经历了可行性研究、招标文件编制、主机合同谈判和执行、现场安装和试验直至运行的全过程.以该工程为研究对象,对变速机组建设必要性、系统设计、设备设计和制造、安装过程中的部分关键技术进行了概要介绍,并特别针对变速机组在中国电网中运行的相关数据展开分析,通过工程实践验证了变速机组的性能优势,可为未来变速机组的设计、制造、安装、试验和运行提供参考和借鉴.
Fengning Pumped Storage Power Station is the first time in China to apply and construct two AC-excited variable-speed generating units,and is also the first time to go through the entire process from feasibility study,tender document preparation,main equipment contract negotiation and execution,on-site installation and testing to operation.This paper briefly introduces the construction necessity,system design,equipment design and manufacturing,and some key technologies during the installation process of the variable-speed units.It particularly analyzes the relevant data of variable-speed unit operating in Chinese power grid.Through engineering practice,the performance advantages of variable-speed units have been verified,which can provide reference and guidance for the design,manufacturing,installation,testing and operation of variable-speed units in the future.
吴培枝;王英伟;穆良;杨梅;张昊晟;王建明;王纯;付晓娣
国网新源集团有限公司,北京 100052||国网新源河北丰宁抽水蓄能有限公司,河北 承德 068350国网新源集团有限公司,北京 100052||国网新源河北丰宁抽水蓄能有限公司,河北 承德 068350国网新源集团有限公司,北京 100052||国网新源河北丰宁抽水蓄能有限公司,河北 承德 068350中国电建集团北京勘测设计研究院有限公司,北京 100024中国电建集团北京勘测设计研究院有限公司,北京 100024中国电建集团北京勘测设计研究院有限公司,北京 100024中国电建集团北京勘测设计研究院有限公司,北京 100024中国电建集团北京勘测设计研究院有限公司,北京 100024
信息技术与安全科学
首次抽水蓄能电站交流励磁变速机组设计制造安装运行
first timepumped-storage power stationAC-excited variable-speed unitdesign and manufactureinstallationoperation
《水力发电》 2026 (4)
73-83,11
国网新源集团有限公司科技项目资助(SGXYKJ-2019-074)