首页|期刊导航|世界有色金属|铅硐山铅锌矿井下核部矿体桃心矿柱人工假底替换试验研究分析与应用

铅硐山铅锌矿井下核部矿体桃心矿柱人工假底替换试验研究分析与应用OA

Research,Analysis,and Application of Artificial False Bottom Replacement Test for Peach Heart Pillars in the Lower Core Ore Body of Lead Zinc Mine in Qiandongshan

中文摘要英文摘要

核部矿体处于铅硐山背斜核部灰岩与千枚岩接触带中,矿体西部为千枚岩,中等稳固;矿体北南东部均为灰岩,稳固.其中桃心矿柱地质储量10308t,铅品位7.56%、锌品位16.32%,综合品位23.88%.常用的采矿方法为分段空场法回采,先采矿房,再回收矿柱,矿柱回采率48%~70%,损失率较大,为了提高矿柱回收率,确保高品位矿能有效回收,考虑矿山井下采场整体配矿,提高经济效益,拟采用人工假底工艺替换桃心矿柱,桃心矿柱采用分层全断面后退式分段回采,用砼或者浆砌片石替换矿柱.

The core ore body is located in the contact zone between the core limestone and phyllite of the Lead Cave Mountain anticline.The western part of the ore body is composed of phyllite,which is moderately stable;The north,south,and east parts of the ore body are all composed of limestone,which is stable.The geological reserves of Taoxin ore pillar are 10308 tons,with lead grade of 7.56%,zinc grade of 16.32%,and comprehensive grade of 23.88%.The commonly used mining method is the segmented open pit method for backfilling.The mining room is first mined,and then the mining pillars are recovered.The recovery rate of the mining pillars is 48%to 70%,and the loss rate is relatively high.In order to improve the recovery rate of the mining pillars and ensure the effective recovery of high-grade ore,considering the overall ore allocation in the underground mining area and improving economic efficiency,it is proposed to use artificial false bottom technology to replace the Taoxin mining pillars.The Taoxin mining pillars will be mined in sections with layered full section retreat,and the pillars will be replaced with concrete or mortar rubble.

齐阳

陕西铅硐山矿业有限公司,陕西 宝鸡 721707

矿业与冶金

桃心矿柱高品位人工假底回采率经济效益

Peach Heart PillarHigh gradeArtificial false bottomRecovery rateeconomic benefits

《世界有色金属》 2026 (5)

82-84,3

评论