首页|期刊导航|煤炭与化工|深部煤层底板高承压含水层水害全周期治理技术研究

深部煤层底板高承压含水层水害全周期治理技术研究OA

Research on full-cycle control technology of water disaster in high confined aquifer of deep coal seam floor

中文摘要英文摘要

针对深部煤层开采承压含水层水害防控问题,基于九龙矿地质、水文地质条件,综合分析了煤层底板高承压含水层突水致灾机理,并针对深部高水压等突水特点,总结形成全周期立体化治理技术.结果表明,针对含构造深部开采工作面,进行采前立体引流区域治理、采中安全性监测及薄弱区重点加固、采后补强加固,提高了回采安全性,实现了深部高承压水上减水开采和无害化开采,对相似条件下煤层开采具有借鉴意义.

Aiming at the problem of water disaster prevention and control in confined aquifer of deep coal seam mining,based on the geological and hydrogeological conditions of Jiulong Mine,the mechanism of water outburst disaster in high confined aquifer of coal seam floor was comprehensively analyzed,and the full-cycle three-dimensional control technology was summarized according to the characteristics of water outburst such as high water pressure in deep coal seam,etc.The results showed that for the deep mining face with structure,the pre-mining three-dimensional drainage regional control,the safety monitoring and key reinforcement of the weak area during mining,and the post-mining reinforcement grouting,which improved the safety of mining,and realized water-reducing mining and harmless mining above deep high confined aquifer.The study had reference significance for coal seam mining under similar conditions.

刘志勇

冀中能源峰峰集团邯郸宝峰矿业有限公司九龙矿,河北邯郸 056200

矿业与冶金

深部开采突水致灾机理全周期防控区域治理引流注浆

deep miningthe mechanism of water outburst disasterwhole-cycle prevention and controlregional controldrainage grouting

《煤炭与化工》 2026 (3)

55-60,65,7

10.19286/j.cnki.cci.2026.03.012