顶管隧道穿越地裂缝的结构性状与防治OACHSSCD
Research on the Structural Behavior and Prevention of Pipe Jacking Tunnel Crossing Ground Fissure
为研究地裂缝活动对顶管隧道的影响,以西安某电力隧道穿越f12地裂缝为背景,建立三维有限元数值模型,分析了地裂缝错动下隧道变形受力特征,并探讨了防治对策.结果表明:地裂缝错动导致隧道在其附近发生显著变形突变,结构受力较大部位在内钢环处.当错动量为50 cm时,下盘部分接头内钢环已达屈服强度,出现"铰链式"张开,显著的张开角位于上盘第6节和下盘第13节接头.衬砌接触压力和应变在上、下盘呈相反变化,地裂缝附近存在管节与围岩的分离现象.建议加强跨地裂缝顶管隧道的纵向刚度,接头采用多道防水措施,"二衬+工字钢"加固可有效控制接头张开和结构纵向应力.研究结果可为地裂缝发育区顶管隧道的结构病害防治提供科学依据.
To study the influence of ground fissure activity on a pipe jacking tunnel,a three-dimen-sional finite element numerical model was established with the background of an electric power tunnel crossing the f12 ground fissure in Xi'an.The deformation and stress characteristics of the pipe jacking tunnel under ground fissure displacement were analyzed,and the structural countermeasures were dis-cussed.The results show that the tunnel experiences significant abrupt deformation near the fissure,with the inner steel ring occurring obvious stress.When the dislocation is 50 cm,the inner steel ring in some joints of the footwall has reached yield strength,exhibiting a"hinge-like"opening phenome-non.The maximum joint opening angle is at the 6th section in the hanging wall and the 13th section in the footwall.Lining contact pressure and strain show opposite changes in the hanging wall and foot-wall,with a clear void area between the tunnel and surrounding soil near the ground fissure.It is rec-ommended to enhance the longitudinal stiffness of the structure for the pipe jacking tunnel crossing ground fissures,adopt multi-layer waterproofing at joints.The reinforcement measure of secondary lin-ing and Ⅰ-steel can effectively control the joint opening and longitudinal stress of the tunnel.The find-ings provide a scientific guidance for preventing structural damage in pipe jacking tunnels in area with developed ground fissure.
史龙;黄磊;李亚锋;苟玉轩;陈东平;唐六九;刘飞鹏
中国电力工程顾问集团西北电力设计院有限公司,陕西 西安 710075中国电力工程顾问集团西北电力设计院有限公司,陕西 西安 710075中国电力工程顾问集团西北电力设计院有限公司,陕西 西安 710075长安大学 地质工程与测绘学院,陕西 西安 710054长安大学 地质工程与测绘学院,陕西 西安 710054中国电力工程顾问集团西北电力设计院有限公司,陕西 西安 710075中国电力工程顾问集团西北电力设计院有限公司,陕西 西安 710075
建筑与水利
顶管隧道地裂缝数值模拟结构性状防治对策
pipe jacking tunnelground fissurenumerical simulationstructural behaviorcounter-measure
《土木工程与管理学报》 2026 (1)
25-34,10
陕西省重点研发计划(2024SF2-GJHX-72)西北电力设计院有限公司科研项目(HQ-2024-P-TD-004)
评论