多轴燃气-蒸汽联合循环机组双高位单跨主厂房布置及优化OA

Layout and Optimization of High-Level Arranged Single Span Main Power House of Multi-Shaft Gas-Steam CCPP

中文摘要英文摘要

采用"一拖一"多轴方案的燃气-蒸汽联合循环机组主厂房,主要有全低位、半高位和双高位三种布置方案.本文针对双高位主厂房布置方案进行开发和优化设计,并成功实施"F级联合循环多轴双高位单跨联合主厂房"的新型布置方案.该方案采用联合主厂房,燃气轮机和蒸汽轮机均采用高位布置,两套机组的汽机岛对称布置在中间,燃机岛顺列布置在两端,同时提出主蒸汽和再热蒸汽系统、循环水系统、凝结水系统、轴封系统、辅汽系统、闭式循环冷却水系统、润滑油系统推荐布置.该方案进一步优化了空间利用、工艺流程布置、美观性、运维便利性,可作为该类型机组优化布置的典型方案.

There are three layout types of main power house for"one tow one"multi-shaft gas-steam combined cycle units which are totally low-level layout,semi high-level layout and double high-level layout.In this article,the design institute focuses on the development and optimization design of the double high-level main power house layout plan,and successfully applied the new layout of"double high-level arranged single span combined main power house for F-class combined cycle power plant".In this plan,both of the gas turbine and the steam turbine are high-level arranged.The steam turbine generator islands of two units are symmetrically arranged in the middle of the main power house,and the gas turbine generator islands of two units are in-line arranged on both sides of the main power house.The recommended layout of main steam and reheat steam system,condenser circulating water system,condensate water system,gland sealing system,auxiliary steam system,closed circuit cooling water system and lube oil system are also presented.This new layout plan can optimize the space utilization,the layout of process,the aesthetics and the convenience of operation and maintenance,serve as a typical optimization of layout for units in the same type.

袁明野;代超;刘玉坤;许臻;范勇刚;杨柠志

中国电力工程顾问集团西南电力设计院有限公司,四川 成都 610021中国电力工程顾问集团西南电力设计院有限公司,四川 成都 610021中国电力工程顾问集团西南电力设计院有限公司,四川 成都 610021中国电力工程顾问集团西南电力设计院有限公司,四川 成都 610021中国电力工程顾问集团西南电力设计院有限公司,四川 成都 610021中国电力工程顾问集团西南电力设计院有限公司,四川 成都 610021

信息技术与安全科学

燃气-蒸汽联合循环机组多轴燃气轮机高位布置单跨主厂房

gas-steam combined cycle power plantmulti-shaft gas turbinehigh-level layoutsingle span main power house

《电力勘测设计》 2026 (3)

32-38,7

10.13500/j.dlkcsj.issn1671-9913.2026.03.006