金沙水电站坝后高位滑坡变形历史及成因分析OA

Deformation history and genesis analysis of high-elevation landslide behind dam of Jinsha Hydropower Station

中文摘要英文摘要

金沙江流域金沙水电站右岸高位边坡近年多次发生变形,威胁下方水电站安全.以金沙水电站坝后高位采空山梁子滑坡为研究对象,采用现场踏勘、无人机摄影、目视光学遥感卫星解译以及基于Sentinel-1A 升轨数据的时序分析技术SBAS-InSAR,对滑坡治理前后的时序曲线及变形破坏历史进行了深入研究.结果表明:① 现场调查揭示,2018 年滑坡的诱发因素主要为下伏采空区顶板塌陷和降雨入渗.② 综合分析认为,采空顶板冒落引起的拉应力区由坡表扩展至坡顶,导致后缘拉裂沉降.岩土体在自身重力作用下,有向下向临空面运动的趋势,下部裂缝与后缘拉裂缝逐渐扩展并相互贯通,形成滑面.山梁子滑坡的破坏模式为"塌落—拉裂"牵引式.③2024 年现场发现前缘新增裂缝,InSAR解译结果表明,治理后坡体仍受采空区影响,呈现蠕变特征.研究成果可为金沙水电站安全运营提供参考.

In recent years,repeated deformations have occurred on the high-elevation slope on the right bank of the Jinsha Hy-dropower Station in the Jinsha River,threatening the safety of the downstream dam.Focusing on the Shanliangzi Landslide,a high-elevation failure associated with a behind-dam abandoned mining area at the Jinsha Hydropower Station,this study systemati-cally investigated the time-series deformation curves and historical failure processes before and after landslide mitigation.Multi-ple technical approaches were integrated,including field reconnaissance,unmanned aerial vehicle(UAV)photogrammetry,visual interpretation of optical remote sensing satellite imagery,and time-series InSAR analysis based on Sentinel-1A ascending orbit data.The key findings were as follows:①Field investigations revealed that the 2018 landslide was primarily triggered by two fac-tors:roof collapse of the underlying abandoned mining area and rainfall infiltration.② Comprehensive analysis indicated that the tensile stress zone induced by mining-induced roof caving propagated from the slope surface upward to the crest,resulting in ten-sile cracking and subsidence at the landslide's rear edge.Primarily influenced by self-weight,the rock-soil mass exhibited a tendency to move downward toward the free face.Gradual expansion and interconnection of the lower cracks and rear-edge ten-sile cracked eventually formed a continuous sliding surface.The failure mode of the Shanliangzi Landslide was classified as a"col-lapse-tensile cracking"retrogressive type.③ Field surveys in 2024 identified newly developed cracks at the landslide's front edge.InSAR interpretation results further confirmed that the slope,despite mitigation measures,remained influenced by the aban-doned mining area and exhibited ongoing creep deformation characteristics.This study provides references for ensuring the long-term safe operation of the Jinsha Hydropower Station.

蒲佐尧;赵伟华;解明礼;谭林;沈百泉

成都理工大学 地质灾害防治与地质环境保护全国重点实验室,四川 成都 610059||成都理工大学环境与土木工程学院,四川 成都 610059成都理工大学 地质灾害防治与地质环境保护全国重点实验室,四川 成都 610059||成都理工大学环境与土木工程学院,四川 成都 610059成都理工大学 地质灾害防治与地质环境保护全国重点实验室,四川 成都 610059||成都理工大学环境与土木工程学院,四川 成都 610059成都理工大学 地质灾害防治与地质环境保护全国重点实验室,四川 成都 610059||成都理工大学环境与土木工程学院,四川 成都 610059成都理工大学 地质灾害防治与地质环境保护全国重点实验室,四川 成都 610059||成都理工大学环境与土木工程学院,四川 成都 610059

建筑与水利

高位滑坡无人机摄影SBAS-InSAR技术山梁子滑坡金沙水电站

high-elevation landslideunmanned aerial vehicle(UAV)photogrammetrySBAS-InSARShanliangzi land-slideJinsha Hydropower Station