砂岩热储完井工艺对采灌能力的对比研究OA

Comparison of well completion techniques in sandstone thermal reservoirs:production versus injection capacity—a case study of Hekou District in Dongying

中文摘要英文摘要

地热井采灌能力决定其开发的整体效益和可持续性.目前地热井主要采用传统的筛管完井方式,普遍存在回灌难的问题.以东营河口区馆陶组砂岩热储为例,开展了筛管完井和射孔完井两种工艺的适应性、产出水水质,以及采灌能力等对比分析和研究.结果表明,射孔完井的地热井的采灌能力和产出水水质均优于筛管完井的地热井.

The production-injection capacity of geothermal wells determines the overall efficiency and sustainable development of sandstone thermal reservoirs.At present,geothermal wells mainly adopt traditional screen pipe well completion methods,which generally face the problem of difficult reinjection.Taking the Guantao Formation sandstone thermal reservoir in Hekou District,Dongying as an example,a comparative analysis and study were conducted on the adaptability,produced water quality,and production-injection capacity of two well completion techniques:screen pipe completion and perforated completion.The results show that the production-injection capacity and produced water quality of geothermal wells with perforated completion are superior to those with screen pipe completion.

石云帆

中石化新星(天津)新能源有限公司,天津 300202

能源科技

砂岩热储地热完井采灌能力

sandstone thermal reservoirgeothermal energywell completionproduction-injection capacity

《石油地质与工程》 2026 (1)

104-108,5

10.26976/j.cnki.sydz.202601015