首页|期刊导航|爆破|复杂环境两座烟囱对向错位控制爆破拆除

复杂环境两座烟囱对向错位控制爆破拆除OA

Controlled Blasting Demolition of Two Chimneys with Opposite Staggered Collapse in Complex Environment

中文摘要英文摘要

因为国家环境保护政策需要,毕节市某已关停焦化厂内2座烟囱需爆破拆除.2座烟囱材质和尺寸完全一致:均为钢筋混凝土结构,外部结构完整,内衬为耐火砖结构,高度为85 m,底部外径为7 m,底部周长为21.98 m,外壁厚度36 cm,内衬厚度24 cm,内衬和外壁之间有4 cm的中空隔热层.烟囱位于城镇区域施工环境复杂,临近工厂厂房、民宅、道路等保护对象(与保护对象最小距离60 m),需要严格控制爆破振动、飞散物等危害效应.考虑两座烟囱同时起爆将产生较大的振动,2座烟囱之间采取毫秒延时间隔爆破,延期间隔时间为110 ms.为进一步控制触地振动,在烟囱倒塌区域铺设4道砂土缓冲堤.为控制爆破飞散物,对爆破切口范围采取2层胶皮网严密防护措施.计算得到爆破振动及爆破飞石等有害效应均满足安全判据要求.爆破效果表明:起爆后2座烟囱按照设计方向对向错位倒塌,距离最近的保护对象振动为0.66 cm/s,远低于振动安全阈值控制标准,产生的飞石在可控范围.本次烟囱爆破拆除可为其他相似工程提供相应借鉴.

To comply with national environmental regulations,controlled blasting was used to demolish two chim-neys at a decommissioned coking plant in Bijie City.The twin chimneys exhibited identical material composition and dimensional specifications:each was a reinforced concrete structure with preserved external shells,incorporating re-fractory brick linings.Both structures measured 85 meters in height,with identical geometric parameters:a 7-meter outer diameter(21.98-meter circumference)at the base,featuring 36-cm-thick outer walls,24-cm-thick refractory linings,and a 4-cm insulating air gap between concentric layers.Situated in an urban setting with complex surround-ings,the chimneys were proximate to protected infrastructure,including industrial buildings,residential areas,and roadways(minimum clearance:60 meters).This required stringent mitigation of blast-induced hazards,particularly ground vibration and flyrock.Given that simultaneous detonation would produce excessive vibration,a sequential mil-lisecond-delay blasting technique with 110 ms inter-chimney delay was implemented.To minimize collapse-induced ground vibrations,four sand-soil cushion berms were strategically placed in the anticipated impact zones.Flyrock pre-vention was ensured by double-layer rubber-mesh reinforcement over the blast-cut sections.Computational analysis verified compliance with all safety standards for blast-induced hazards,including vibration and flyrock.Field observa-tions confirmed the chimneys achieved controlled diagonal collapse in opposite directions as planned.Vibration moni-toring at the closest protected structure registered 0.66 cm/s,well below the prescribed safety limit,while flyrock was effectively contained within designated boundaries.This successful demolition offers key technical benchmarks for similar engineering projects.

李杰;王园园;张义平;刘登科

保利新联爆破工程集团有限公司,贵阳 550002||贵州大学矿业学院,贵阳 550025贵州建设职业技术学院,贵阳 551499贵州大学矿业学院,贵阳 550025保利新联爆破工程集团有限公司,贵阳 550002

建筑与水利

钢筋混凝土烟囱爆破拆除对向错位安全防护

reinforced concrete chimneyblasting demolitionopposite staggeredsafety protection

《爆破》 2026 (1)

148-155,8

10.3963/j.issn.1001-487X.2026.01.016

评论