首页|期刊导航|水利学报|后帮有限结合重力坝加高:理论与实践

后帮有限结合重力坝加高:理论与实践OA

Heightening and slope thickening of gravity dams with partial bonding interface:theory and practice

中文摘要英文摘要

后帮式是重力坝加高的主要形式,其面临的关键技术难题为新老混凝土结合和新老坝块分载.本文结合丹江口大坝加高工程,开展了理论分析、数值模拟、室内试验及大坝原位试验等系列研究,提出了"后帮有限结合"重力坝加高理论,研发了配套技术并成功应用于工程实践.主要研究成果如下:(1)揭示了新老混凝土结合面开裂机理,即后帮混凝土的厚度处于年变化气温影响范围时,新混凝土水化热引起的温升温降变形与周期性气温导致的"翘-鼓"变形叠加,且受老混凝土约束,致使结合面产生超标拉应力和剪应力,是结合面开裂的主要原因;(2)加高后坝体不再属于均质、连续的整体结构,传统材料力学计算方法不再适用,为此提出基于应力和稳定的有限元等效计算方法及控制标准;(3)提出"加大冷却力度,延长一冷时间,控制最高温度,减小降温范围"的综合温控措施,结合表面保温和新混凝土坝块分缝,可有效降低结合面法向拉应力和坡向剪应力;(4)提出"结合面增强、配置锚筋、切割键槽"的结构增强措施,可显著提高大坝整体联合承载能力并改善受力状态.丹江口大坝加高工程应用结果表明:新老混凝土界面结合度大于 30%即可保障大坝安全.监测数据显示,典型坝段结合面张开或微张开的测缝计比例为47%,对应结合度为53%,高于安全控制指标;实测大坝变形与计算结果吻合良好,验证了大坝实际工作性态与设计状态的一致性.

It is a common practice to thicken the downstream slope in gravity dam heightening,for which there are two key technical challenge:the bonding between new and old concrete and the load distribution between new and old dam blocks.This study,using the Danjiangkou Dam Heightening Project as a case study,conducted a series of research including theoretical analysis,numerical simulation,laboratory tests,and in-situ experiments,proposed the"partial bonding of new and old concrete interface"theory for gravity dam heightening and developed supporting technologies successfully applied to the engineering practice at the Danjiangkou Project.The main research findings are as follows:(1)The cracking mechanism at the interface between new and old concrete was revealed.When the thickness of new concrete on the downstream slope falls within the range affected by annual temperature variations,the combined deformation of thermal expansion/contraction due to concrete hydration heat and periodic"depressing-bulging"caused by air temperature cycles,constrained by the old concrete,induces excessive tensile and shear stresses at the interface,forming the primary cause of interface opening.(2)It was found that the heightened dam is no longer a homogeneous,continuous monolithic structure after heightening,rendering traditional material mechan-ics calculation methods inapplicable.Finite element equivalent calculation methods and control criteria for stress and stability were therefore proposed.(3)A comprehensive temperature control strategy of"increasing cooling intensity,extending primary cooling duration,controlling peak temperature,and reducing cooling range"was developed.Com-bined with surface thermal insulation and division of new concrete blocks,this strategy can effectively reduce the normal tensile stress and slope shear stress at the interface.(4)Structural enhancement measures including"strength-ening interface,installing anchor bars,and cutting keyways"were proposed,significantly improving the overall joint load-bearing capacity and stress state of the dam.Application results from the Danjiangkou Dam Heightening Project show that a bonding ratio over 30%at interface between new and old concrete can ensure dam safety.Monitoring data indicate that 47%of the measuring joint meters of typical dam sections showed opening or slight opening status,cor-responding to a bonding ratio of 53%,which is greater than the safety control index.The measured dam deformations agree well with the computational results,verifying that the actual operational behavior of the dam is consistent with the design state.

钮新强;张国新;颜天佑;刘毅;周秋景;张磊

长江勘测规划设计研究有限责任公司,湖北 武汉 430010流域水循环与水安全全国重点实验室 中国水利水电科学研究院,北京 100038长江勘测规划设计研究有限责任公司,湖北 武汉 430010流域水循环与水安全全国重点实验室 中国水利水电科学研究院,北京 100038流域水循环与水安全全国重点实验室 中国水利水电科学研究院,北京 100038流域水循环与水安全全国重点实验室 中国水利水电科学研究院,北京 100038

建筑与水利

重力坝加高后帮式有限结合新老混凝土结合等效算法

gravity dam heighteningdownstream slope thickeningpartial bondingbonding of new and old con-creteequivalent algorithm

《水利学报》 2026 (1)

49-63,15

国家重点研发计划项目(2021YFC3090102)

10.13243/j.cnki.slxb.20250105

评论