首页|期刊导航|水利学报|黑山峡水风光蓄互补系统优化配置及生态效益研究

黑山峡水风光蓄互补系统优化配置及生态效益研究OA

Study on optimal configuration and ecological benefits of the Heishanxia hydro-wind-solar-pumped storage complementary system

中文摘要英文摘要

水利枢纽工程除了发挥防洪、供水等常规功能外,还能促进风光新能源高水平开发利用和区域生态保护.黄河流域几字弯区域风光资源丰富,由于缺少灵活调节能力导致区域内风光新能源开发利用受到了限制,同时区域煤炭开采和火电站运行同时还增加了生态保护压力.本研究分析了黑山峡水利枢纽(规划装机容量为2000 MW)在促进几字弯区域风光新能源开发利用中发挥的关键作用:黑山峡水利枢纽结合抽水蓄能电站(规划装机容量为3000 MW),采取考虑基荷的常规运行方式可配套开发自身装机容量1.89倍的风光新能源(风电3716 MW和光伏5760 MW);采取无基荷要求的灵活运行方式可配套开发自身装机容量2.02倍的风光新能源(风电4212 MW和光伏5888 MW),与常规运行方式相比,灵活运行方式的发电效益增加7.12%.同时依托黑山峡水利枢纽建成的5888 MW光伏电站可显著促进区域内植被恢复,植被净初级生产力每年可增加18.31×108 g 干物质量(相当于减少1093 t标准煤排放的CO2).分析研究表明,黑山峡水利枢纽具有促进清洁能源转型和生态保护的双重作用,对促进黄河流域生态保护和高质量发展具有重要意义.

In addition to conventional functions like flood control and water supply,hydropower projects can also pro-mote the high-quality development and utilization of wind and solar energy while supporting regional ecological con-servation.The Ordos Loop of the Yellow River is rich in wind and solar resources;however,the lack of flexible regu-lation capacity has limited the development and utilization of these resources in the area.Additionally,coal mining and thermal power plant operations in the region have intensified ecological pressure.This study analyzes the key role of the Heishanxia hydropower project(planned installed capacity of 2000 MW)in facilitating the exploitation of wind and solar energy within the Ordos Loop.The results indicate that the Heishanxia hydropower project,integrated with a pumped storage hydropower plant with planned installed capacity of 3000 MW,can support the development of wind and solar energy at 1.89 times its own capacity(3716 MW of wind power and 5760 MW of solar power)under a conventional baseload-inclusive operation mode.Under a flexible operation mode without baseload requirements,it can support 2.02 times its own installed capacity(4212 MW of wind power and 5888 MW of solar power).Compared with the conventional operation mode,the flexible operation mode increases power generation benefits by 7.12%.Fur-thermore,the 5888 MW photovoltaic power plant,built based on the Heishanxia hydropower project,can signifi-cantly promote vegetation restoration in the region,increasing the net primary productivity of vegetation by 18.31×108 g dry matter annually(equivalent to reducing CO2 emissions from 1093 t of standard coal).The analysis demonstrates that the Heishanxia hydropower project will play a dual role in facilitating the transition to clean energy and enhanc-ing ecological conservation,holding significant importance for promoting ecological protection and high-quality devel-opment in the Yellow River Basin.

吴川东;杨大文;丛振涛;张一

清华大学 水圈科学与水利工程全国重点实验室,北京 100084||清华大学 水利水电工程系,北京 100084清华大学 水圈科学与水利工程全国重点实验室,北京 100084||清华大学 水利水电工程系,北京 100084清华大学 水圈科学与水利工程全国重点实验室,北京 100084||清华大学 水利水电工程系,北京 100084清华大学 水圈科学与水利工程全国重点实验室,北京 100084||清华大学 水利水电工程系,北京 100084

建筑与水利

黑山峡水利枢纽水风光蓄互补系统能源转型生态保护

Heishanxia Hydropower Projecthydro-wind-solar-pumped storage complementary systemenergy tran-sitionecological conservation

《水利学报》 2026 (2)

319-329,11

国家自然科学基金项目(42041004)水圈科学与水利工程全国重点实验室项目(sklhse-TD-2024-A01)

10.3724/j.slxb.20250046

评论