巴拉水电站生态机组取消调压阀研究与应用OA
Research and application of eliminating pressure-regulating valves in ecological units at Bala Hydropower Project
巴拉水电站地质条件十分复杂,枢纽布置上制约因素较多.可研阶段巴拉水电站生态机组设置有调压阀,后续工程优化布置后,取消了调压阀.为此,对巴拉水电站生态机组取消调压阀方案进行了深入的过渡过程仿真分析论证,结果表明:过渡过程仍满足规范要求,因此取消调压阀是可行的,且具有显著经济效益,可为同类电站的设计提供借鉴和参考.
The geological conditions at the Bala Hydropower Project are highly complex,with numerous con-straints on the hub layout.During the feasibility study phase,the ecological units at the Bala Hydropower Pro-ject were equipped with pressure regulating valves.However,subsequent engineering optimization eliminated these valves.To address this,the author conducted an in-depth simulation analysis of the transition process for the ecological units without pressure regulating valves.The results demonstrate that the transition process still meets regulatory requirements,confirming the feasibility of eliminating the valves.This change yields signifi-cant economic benefits and provides valuable reference for the design of similar hydropower projects.
赵建波
四川省清源工程咨询有限公司,四川 成都 610072
交通工程
调压阀过渡过程试验
pressure regulating valvetransient processtest
《四川水力发电》 2026 (1)
72-77,6
评论