盾构隧道穿越高压燃气管线施工控制技术研究OA
Research on Construction Control Techniques for Shield Tunneling Across High-Pressure Gas Pipelines
为解决软土地层中盾构隧道长距离平行穿越高压燃气管线的施工扰动控制难题,保障管线运行安全,以佛山地铁四号线绿岛湖北站至绿岛湖中站区间盾构工程为依托,提出TRD隔离墙、双模盾构模式选择与分阶段参数调控等施工控制技术.通过TRD隔离墙构建物理隔离屏障,选用泥水平衡模式,对接近区、下穿区、远离区的总推力、泥水舱压力等掘进参数动态调控,优化同步注浆工艺,并结合三维有限元模拟与现场监测验证技术效果.结果显示,TRD隔离墙能有效阻断地层侧向变形传递,分阶段参数调控等控制技术使高压燃气管线最大沉降控制在4.85 mm以内,满足限值要求,地表沉降控制在15 mm以内.研究表明,所提技术可解决软土地区常规注浆加固不足的难题,为类似工程安全施工提供实践参考.
To address the challenge of controlling construction-induced disturbances during long-distance parallel shield tunneling through high-pressure gas pipelines in soft soil strata and to ensure pipeline operational safety,this study focuses on the shield tunneling section between Lvdao Lake North Station and Lvdao Lake Central Station of Foshan Metro Line 4.A series of construction control techniques are proposed,including the implementation of a TRD(Trench cutting Re-mixing Deep wall)isolation wall,selection of dual-mode shield tunneling methods,and staged regulation of tunneling parameters.A physical isolation barrier is established via the TRD wall,and the slurry pressure balance mode is adopted.Key tunneling parameters—such as total thrust and slurry chamber pressure—are dynamically adjusted in different zones(approach zone,under-crossing zone,and exit zone).In addition,the synchronous grouting process is optimized.The effectiveness of these techniques is verified through three-dimensional finite element simulation and on-site monitoring.Results indicate that the TRD isolation wall effectively blocks the transmission of lateral soil deformation,and that staged parameter control restricts the maximum settlement of the high-pressure gas pipeline to within 4.85 mm,meeting the design limits.Surface settlement is maintained within 15 mm.The study demonstrates that the proposed techniques effectively overcome the limitations of conventional grouting reinforcement in soft soil areas and offer practical guidance for the safe construction of similar projects.
张耀辉;刘子扬
佛山市地铁建设有限公司,广东 佛山 528000西安建筑科技大学,陕西 西安 710055
建筑与水利
盾构隧道高压燃气管线施工控制TRD隔离墙
shield tunnelinghigh-pressure gas pipelineconstruction controlTRD isolation wall
《工业技术与职业教育》 2026 (1)
6-12,71,8