列控联锁一体化系统多站控制的功能实现研究OA
Research on Function Implementation of Multi-Station Control for Train Control Center and Interlocking Integrated System
为解决新型列控系统列控联锁一体化在多站控制场景下的难点,分析单站控制与多站控制的区别,基于站间的内部交互逻辑,重点对轨道电路编码、临时限速处理、区间占用逻辑检查功能以及区间改变运行方向等核心功能在多站控制场景下的实现难点进行分析,并分别提出对应的解决思路,使列控联锁一体化在多站控制场景下能够满足既有列控系统的功能需求.
To address the difficulties of the train control center and interlocking integrated system of the new train control system under the multi-station control scenario,this paper analyzes the differences between single-station control and multi-station control.Based on the inter-station internal interaction logic,it mainly analyzes the implementation difficulties of track circuit coding,temporary speed restriction processing,and section occupancy logic checking functions as well as section running direction reversal and other core functions under the multi-station control scenario.It also puts forward corresponding solutions,enabling the train control center and interlocking integrated system to meet the functional requirements of existing train control systems under multi-station control scenarios.
甘庆鹏;蒋红军;徐先良;刘鑫源;路飞;石文昊
卡斯柯信号有限公司,北京 100070卡斯柯信号有限公司,北京 100070卡斯柯信号有限公司,北京 100070卡斯柯信号有限公司,北京 100070卡斯柯信号有限公司,北京 100070卡斯柯信号有限公司,北京 100070
交通工程
高速铁路列控联锁一体化列控中心计算机联锁多站控制被控站
high-speed railwaytrain control center and interlocking integrationtrain control centercomputer based interlockingmulti-station controlcontrolled station
《铁路通信信号工程技术》 2026 (1)
53-58,6
卡斯柯信号有限公司科研项目(RA.99124046)
评论