针对双层大跨桁架施工中存在的工艺协同性不足、荷载分配算法缺失及绿色建造滞后等问题,该文以西部(重庆)科学会堂项目为工程背景,提出"一体化小单元拼装-双层同步吊装-分级智能卸载"技术体系.通过工厂高精度预制小单元(拼装误差不超过 0.8 mm),结合履带吊双机协同抬吊与BIM模拟优化吊点布置,实现双层桁架同步安装(标高与轴线偏差不超过 3mm);设计"安装-卸载两用支撑",结合ANSYS有限元模拟与应力动态监测(精度±1 MPa),建立分级卸载控制流程,确保卸载高差不超过15 mm,应力变化率不超过10%.工程实践表明,该技术将施工工期缩短 30 天,成本降低 22%(累计节约 746.84 万元),变形控制满足规范要求(最大下挠值12 mm,位移L/4000).研究可攻克异形节点预拼装误差大、高空作业风险高及非对称荷载卸载难题,形成《双层大跨桁架同步施工工法》,为 50~80 m跨度钢结构工程提供了工业化、智能化与绿色化建造的可行方案,具有显著的经济效益与推广价值.

Aiming at the problems of insufficient process coordination,lack of load distribution algorithms,and lagging green construction in the construction of double-layer large-span trusses,this paper takes the Western(Chongqing)Science Hall project as the engineering background and proposes a technical system of"integrated small-unit assembly-double-layer synchronous hoisting-graded intelligent unloading."Through high-precision prefabrication of small units in the factory(assembly error≤0.8 mm),combined with dual-crane coordinated lifting by crawler cranes and BIM simulation to optimize lifting point arrangement,synchronous installation of double-layer trusses is achieved(elevation and axis deviation≤3 mm).The design of"dual-purpose installation-unloading supports,"combined with ANSYS finite element simulation and dynamic stress monitoring(accuracy±1 MPa),establishes a graded unloading control process,ensuring an unloading height difference≤15 mm and stress variation rate≤10%.Engineering practice shows that this technology reduces the construction period by 30 days and costs by 22%(cumulative savings of 7.468 4 million yuan),with deformation control meeting specification requirements(maximum deflection value of 12 mm,displacement L/4 000).The research overcomes challenges such as large pre-assembly errors in irregular joints,high risks of high-altitude operations,and asymmetric load unloading,forming the"Double-Layer Large-Span Truss Synchronous Construction Method."It provides a feasible solution for industrialized,intelligent,and green construction of steel structure projects with spans of 50-80 m,demonstrating significant economic benefits and promotion value.

熊煊炎;张强;郭凯;杨俊;于加林;周耀谊

中国水利水电第四工程局有限公司,西宁 810007中国水利水电第四工程局有限公司,西宁 810007中国水利水电第四工程局有限公司,西宁 810007中国水利水电第四工程局有限公司,西宁 810007中国水利水电第四工程局有限公司,西宁 810007中国水利水电第四工程局有限公司,西宁 810007

交通工程

双层大跨桁架同步安装分级卸载一体化拼装智能监测

double-layer long-span trussesynchronous installationhierarchical unloadingintegrated assemblyintelligent monitoring