切顶留巷围岩卸压特性及支护效果OA
Pressure relief characteristics and support effect of surrounding rock for roof-cutting retained roadway
为深入探究切顶卸压关键技术参数和留巷效果,以东荣二矿1803工作面回风巷聚能爆破切顶留巷为工程背景,确定留巷切顶高度和爆破钻孔深度,分析切顶后巷道围岩应力和位移变化,优化爆破切顶钻孔偏角.研究结果表明:1803工作面留巷切顶合理高度为6.0 m,爆破切顶钻孔的合理深度为6.5 m;切顶后留巷道顶板垂直应力降低幅度可达30%,垂直位移减小幅度可达33%,切顶钻孔偏向采空区15°时卸压效果最佳;现场爆破切顶钻孔的间距为0.6 m,隔孔起爆,并增设"U"型钢可缩立柱-单体液压支柱-粉煤灰袋补强支护体系.留巷监测数据显示,顶底板移近量平均为385 mm,两帮移近量平均为245 mm,巷旁支架压力维持在37~40 MPa,切顶留巷围岩变形稳定,留巷效果良好.
To investigate the key technical parameters roof-cutting pressure relief of the cut and the effect of retained roadway,this study conducted in-depth research by taking Dongrong No.2 Coal Mine as the engineering background,and implemented an experimental project of roof-cutting and roadway retaining by using shaped charge blasting in the return air roadway of the 1803 working face.The height of roof cutting for roadway retaining and the depth of blasting boreholes were calculated and determined,the stress and displacement changes of the surrounding rock in the roadway after roof cutting were simulated and analyzed,and the deviation angle of the blasting boreholes for roof cutting was optimized,meanwhile,the effect of retaining roadway was investigated on site.Research results show that the reasonable height of roof cutting for roadway retaining in 1803 working face is 6.0 m,and the reasonable depth of blasting boreholes for roof cutting is 6.5 m.After roof cutting,the vertical stress on the roof of the retained roadway decreases by up to 30%,and the vertical displacement decreases by up to 33%.It is found that the pressure relief effect is best when the roof cutting boreholes are inclined towards the goaf by 15°.The spacing between blasting boreholes on site is 0.6 m,with hole-separating detonation implemented,and a reinforced support system consisting of U-shaped steel retractable pillars-single hydraulic props-fly ash bags was added implemented.The monitoring data of roadway retaining shows that the average approaching displacement of the roof and floor is 385 mm,and the average approaching displacement of the two sides of the roadway is 245 mm.The pressure of the roadway side supports is maintained at 37-40 MPa,and the deformation of the surrounding rock in the roof cutting roadway is stable,indicating favorable roadway retention performance.
张春华;刘浩杰;胡威;李师
辽宁工程技术大学 安全科学与工程学院,辽宁 葫芦岛 125105||辽宁工程技术大学 矿山热动力灾害与防治教育部重点实验室,辽宁 葫芦岛 125105辽宁工程技术大学 安全科学与工程学院,辽宁 葫芦岛 125105宽甸满族自治县应急管理事务服务中心,辽宁 丹东 118200辽宁工程技术大学 安全科学与工程学院,辽宁 葫芦岛 125105
矿业与冶金
切顶留巷围岩变形聚能爆破卸压特性巷道支护
roof-cutting and retained roadwaysurrounding rock deformationshaped charge blastingpressure relief characteristicsroadway support
《辽宁工程技术大学学报(自然科学版)》 2026 (1)
1-7,7
国家自然科学基金项目(52374204)