首页|期刊导航|江苏水利|基于BIM与模糊综合评价的大孔闸施工质量动态优化研究

基于BIM与模糊综合评价的大孔闸施工质量动态优化研究OA

Research on dynamic optimization of construction quality for large orifice sluices based on BIM and fuzzy comprehensive evaluation

中文摘要英文摘要

依托吴淞江界浦港大孔闸工程,创新性构建"BIM+数字孪生"精细化管理体系.通过集成多源工程数据开发虚拟施工沙盒系统,融合模糊综合评价模型,实现施工效率提升40%、工序偏差率降低35%.研究表明:基于三维可视化预控、动态资源调配及质量追溯机制,该技术体系显著提升隐蔽工程验收合格率45%,质量问题整改响应速度加快50%,复杂质量问题定位精度达92%;推动管理模式转型,使预防性成本占比从18%提升至43%,故障性成本下降31%.成果验证了BIM技术对水利工程数字化转型的结构性赋能效应,为同类工程提供创新解决方案.

Based on the Jiangpu Port Large Orifice Sluice Project on the Wusong River,an innovative refined management system integrated with BIM and digital twin technologies was established.By developing a virtual construction sandbox system that integrates multi-source engineering data and incorporating the fuzzy comprehensive evaluation model,the system achieved a 40%improvement in construction efficiency and a 35%reduction in process deviation rate.The research results show that,based on the mechanisms of 3D visual precontrol,dynamic resource allocation and quality traceability,this technical system has significantly increased the acceptance rate of concealed works by 45%,accelerated the response speed for rectifying quality defects by 50%,and attained a 92%accuracy rate in locating complex quality issues.It also promoted the transformation of management mode,raising the proportion of preventive costs from 18%to 43%and cutting failure costs by 31%.The research findings verify the structural enabling effect of BIM technology on the digital transformation of water conservancy projects,providing an innovative solution for similar projects.

陈娟娟;谭雪怡;邱立波;尚琦智;李耀

江苏省泰兴市滨江镇水利站,江苏 泰州 225400江苏省水利工程科技咨询股份有限公司,江苏 南京 210029江苏省水利工程科技咨询股份有限公司,江苏 南京 210029江苏淮阴水利建设有限公司,江苏 淮安 223000南通大学交通与土木工程学院,江苏 南通 226000

建筑与水利

BIM新型大孔闸精细化管理数字孪生模糊综合评价

BIMnew large orifice sluicerefined managementdigital twinfuzzy comprehensive evaluation

《江苏水利》 2026 (1)

37-40,52,5

江苏省水利科技项目(2021057,2023034)