首页|期刊导航|人民黄河|基于地表水-地下水耦合模拟的傍河水源地补给能力评价

基于地表水-地下水耦合模拟的傍河水源地补给能力评价OA

Evaluation of Recharge Capacity of Riverside Water Source Based on Coupling Simulation of Surface Water and Groundwater

中文摘要英文摘要

为探究傍河水源地不同工况下水源转换过程中水文循环演变规律,以郑州市九五滩水源地为研究对象,基于地质、水文、气象和人工取用水等数据,构建傍河水源地地表水-地下水转换过程模拟模型;基于花园口水文站地表水日流量和典型观测井地下水位数据,对模型参数进行率定和验证,明晰九五滩水源地的水循环量和地下水的分布特征.结果表明:1)MIKE 11 和MIKE SHE模型在率定和验证期间的纳什效率系数分别为 0.94 和 0.71,相对误差都控制在±15%以内,表明模型对花园口水文站日流量和观测井地下水位模拟较为准确;2)在进一步调水调沙和南部地下水位回升情况下,九五滩水源地仍存在显著的地下水降落漏斗,当开采量减小到 100 万m3时地下水降落漏斗不断减小直至消失;3)研究区地下水基本保持从北向南、从西向东的流动趋势,在现有开采量下地下水开采井区域受到周围区域的全面补给.

In order to explore the evolution law of the hydrologic cycle in the water source conversion process under different working condi-tions,this paper took Jiuwutan water source in Zhengzhou as the research object,and constructed a simulation model of surface water-ground-water transfer process in the riverside source area based on geological,hydrological,meteorological and artificial water withdrawal data.Based on the daily surface water flow data from the Huayuankou hydrological station and groundwater level data from typical observation wells,the model parameters were calibrated and verified,and the distribution characteristics of water circulation and groundwater in Jiuwutan water source area were clarified.The results show that:1)The Nash efficiency coefficients of MIKE 11 and MIKE SHE models are 0.94 and 0.71 respectively during calibration and verification,and the relative errors are controlled within±15%,which indicates that the models are more accurate in simulating the daily flow of Huayuankou hydrology station and the groundwater level process of observation well;2)There is still a significant groundwater drop funnel in the case of further water and sediment transfer and the recovery of groundwater level in the south,and the groundwater drawdown funnel will continuously diminish until it vanishes when the extraction volume is reduced to 1 million m3;3)The groundwater in the study area basically keeps the trend of flow from north to south and from west to east,but under the current exploitation amount,the groundwater exploitation well area is fully replenished by the surrounding area.

DOU Ming;PAN Deng;DOU Jingfeng;GAO Ting;HU Haodong;ZHANG Shengjie

Zhengzhou University,Zhengzhou 450001,ChinaInstitute of Natural Resources Monitoring and Comprehensive Land Improvement of Henan Province,Zhengzhou 450016,ChinaInstitute of Natural Resources Monitoring and Comprehensive Land Improvement of Henan Province,Zhengzhou 450016,ChinaZhengzhou University,Zhengzhou 450001,ChinaNingbo Water Conservancy&Hydropower Planning and Design Institute Co.,Ltd.,Ningbo 330200,ChinaZhengzhou University,Zhengzhou 450001,China

天文与地球科学

地表水-地下水过程耦合MIKE SHE模型补给能力评价傍河水源地郑州市九五滩水源地

surface water-groundwater process couplingMIKE SHE modelrecharge capacity evaluationriverside water sourceJiuwutan water source in Zhengzhou

《人民黄河》 2026 (1)

60-66,7

郑州大学院士团队科研启动项目(13432340370)河南省科技攻关计划项目(222102320211)河南省高等学校重点科研项目(21A570008)

10.3969/j.issn.1000-1379.2026.01.010

评论