"源网荷储一体化项目"的发展现状与关键技术OA
Development Situation and Key Technologies of Source-Grid-Load-Storage Integrated Projects
"源网荷储一体化项目"(简称一体化项目)的建设与运营可以提升新能源就地消纳率和系统清洁用电率,提升电力市场的灵活性,推动新型电力系统建设和支撑"双碳"目标实现.目前,一体化项目的发展进度并不理想,推进慢、落地难等问题比较突出.文中首先归纳并总结一体化项目在政策推行、申报实施方面的发展近况;随后,梳理一体化项目当前的技术应用与市场参与现状;然后,总结一体化项目推行过程中的关键技术问题;最后,展望一体化项目未来的发展趋势和研究方向.
The construction and operation of the source-grid-load-storage integrated projects(hereinafter referred to as the integrated projects)can enhance local renewable-energy consumption and clean-electricity share,increase power-market flexibility,and propel the development of a new power system that supports the goals of carbon emission peak and carbon neutrality.At present,the progress of integrated projects is unsatisfactory,with slow advancement and difficult deployment being prominent issues.This paper first summarizes the latest policy promotion and application-implementation status of integrated projects.It then reviews the current state of technology deployment and market participation.Next,it identifies the key technical challenges encountered during project rollout.Finally,it outlines future development trends and research directions.
MENG Xuyao;LIU Jiajia;WEN Fushuan;LIU Fuyan;YING Qi
College of Electrical Engineering,Zhejiang University,Hangzhou 310027,ChinaCollege of Electrical Engineering,Zhejiang University,Hangzhou 310027,ChinaCollege of Electrical Engineering,Zhejiang University,Hangzhou 310027,ChinaEconomic Research Institute of State Grid Zhejiang Electric Power Company,Hangzhou 310008,ChinaEconomic Research Institute of State Grid Zhejiang Electric Power Company,Hangzhou 310008,China
新型电力系统电力市场新能源源网荷储实施路径
new power systemelectricity marketrenewable energysource-grid-load-storageimplementation path
《电力系统自动化》 2026 (1)
1-19,19
国家电网有限公司科技项目(JY02202437). This work is supported by State Grid Corporation of China(No.JY02202437).
评论