中文摘要

To address the challenges of ill-defined optimization objectives,difficult constraint coordination,and lack of quantitative basis for interconnection splicing and switch placement in current distribution network topology optimization,this paper proposes a data-driven intelligent optimization method for panoramic construction of distribution network topology based on the Common Information Model(CIM).This method integrates multi-source heterogeneous data relationships-including equipment,terminals,and connection nodes-through joint analysis of multi-line CIM and hierarchical topology extraction.It automatically identifies feeder trunk paths and branch structures,incorporates inter-connection switch splicing and intelligent path optimization strategies,and performs topology opti-mization and switch placement based on the principle of minimizing outage impact.This constructs a complete,robust main-branch topology graph model.The algorithm employs depth-first search(DFS)for supply path modeling,complemented by semantic analysis of equipment attributes and hierarchical node classification to refine topology simplification.Batch testing on a dataset of 6880 medium-voltage feeders in a Central China city achieved a 98.30%successful modeling rate for complete interconnection information,with an average processing time of approximately 4.57 s per feeder.Further validation using representative overhead,cable,and hybrid lines demonstrated high consistency between the automatically generated topology and the original system diagram in node identification,path con-struction,and information annotation,confirming the algorithm''s structural adaptability and engi-neering practicality.These findings provide dynamically interactive topology model support for multiple distribution network scenarios-including planning,operation,and maintenance-offering significant application and promotion value.

Lixiao Mu;Leixiong Wang;Zheng Xiao;Hang Li;Sichang Xiao;Siqiang Li;Jie Xiong;Menglu Fan

Hubei Electric Power Co.,Ltd.,Wuhan,430077,ChinaWuhan Power Supply Company,State Grid Hubei Electic Power Company,Wuhan,430013,ChinaWuhan Power Supply Company,State Grid Hubei Electic Power Company,Wuhan,430013,ChinaWuhan Power Supply Company,State Grid Hubei Electic Power Company,Wuhan,430013,ChinaWuhan Power Supply Company,State Grid Hubei Electic Power Company,Wuhan,430013,ChinaWuhan Power Supply Company,State Grid Hubei Electic Power Company,Wuhan,430013,ChinaWuhan Power Supply Company,State Grid Hubei Electic Power Company,Wuhan,430013,ChinaWuhan Power Supply Company,State Grid Hubei Electic Power Company,Wuhan,430013,China

信息技术与安全科学

Distribution network topology modelingCommon information modelAutomated graph model constructionPath identifi cationMain-branch structureData parsing

《Smart Power & Energy Security》 2025 (3)

P.165-173,9

supported by the State Grid Corporation of China science and technology project funding(5400-202322560A-3-2-ZN).