通过对2.25Cr-1Mo-0.25V Ⅳ锻焊加氢反应器制造过程的监理,结合监理人员发现的反应器封头在制取热处理试板过程中出现的与设计确认文件不符的问题,运用设备工程监理的方法,分析问题出现的原因,寻求问题解决方案,跟踪问题处理结果,归纳整理问题处理过程文件,最终对问题形成闭环.通过对问题的剖析、解决问题的过程方法的总结,为今后类似锻焊加氢反应器封头热处理试板取样把控提供参考.

Through the supervision of the manufacturing process of 2.25Cr-1Mo-0.25V Ⅳ forged welded hydrogenation reactor,combined with the problem found by the supervisors that the reactor head did not conform to the design confirmation documents during the process of obtaining and heat treatment of test plates,used the method of equipment engineering supervision to analyze the reasons for the problem,seek solutions to the problem,track the results of problem handling,and summarize the process documents of problem handling.In the end,a closed-loop was formed for the problem.Through the analysis of the problem and the summary of the process and methods for solving it,it provides reference for the key process node of obtaining and heat treatment of test forged welded hydrogenation reactor head in the future manufacturing process.

宋飚;张刘伟

南京三方化工设备监理有限公司 南京 210036南京三方化工设备监理有限公司 南京 210036

通用工业技术

加氢反应器封头热处理试板取样偏差监理服务

Hydrogenation reactorHot-treated test plate for flangesSampling biasSupervision service

《设备监理》 2025 (2)

26-29,62,5

10.19919/j.issn.2095-2465.2025.04.007

评论