特长引水隧道小断面双护盾TBM快速施工技术OA

Rapid Construction Technology of Double Shield TBM in the Extra-long Water Diversion Tunnel with Small Section

中文摘要英文摘要

依托南亚某国特长引水隧道工程,对影响小断面双护盾TBM施工进度的地质条件、资源组织、技术方案、环境等因素进行分析,通过科学的管理理念和多种技术措施,以及适宜的制度建设和精细化的过程控制,提升掘进效率,TBM施工进度屡次实现重大突破.

Relying on the extra-long water diversion tunnel project in a South Asian country,the geological,resource organization,technical scheme and environmental and other factors affecting the construction progress of the small section double-shield TBM are analyzed.Through scientific management concepts and a variety of technical measures,as well as appropriate system construction and refined process control,the excavation efficiency has been improved,and the TBM construction schedule has repeatedly achieved major breakthroughs.

胡天然

中铁二局集团有限公司国际公司,成都 610306

交通运输

复杂条件;双护盾TBM;超前预报;五步注浆;快速掘进;风险管控;经济性

complex conditions;double shield TBM;advanced prediction;five steps grouting;apid excavation;risk control;economy